PED PRESSURE EQUIPMENT

PED PRESSURE EQUIPMENT MANUFACTURING


Stainless-Steel Pressure Equipment Manufactured to PEDRequirements

Mapsons manufactures custom stainless-steel pressure equipment and pressure vessels for industrial and process applications, with manufacturing activities aligned to the applicable requirements of the Pressure Equipment Directive (PED) 2014/68/EU.

Our capabilities cover fabrication, welding, machining, assembly, inspection, testing, material traceability and technical documentation for customer-specific pressure equipment.

PED 2014/68/EU | Stainless Steel | Custom Manufacturing | Pressure Equipment

Manufacturing with PED in Focus

Pressure equipment intended for the European market requires controlled manufacturing, appropriate materials, qualified welding processes, inspection, testing and technical documentation.


At Mapsons, we are developing and implementing manufacturing practices to support pressure-equipment projects requiring compliance with the applicable provisions of PED 2014/68/EU.


Our approach focuses on maintaining control throughout the manufacturing process — from material procurement and fabrication to welding, inspection, testing and final documentation.

Manufacturing with PED in Focus

CUSTOM PRESSURE EQUIPMENT

Stainless-steel pressure vessels manufactured according to approved drawings and specifications.

PRESSURE VESSELS

Custom vessels designed for specific process applications.

PED Equipments

Stainless-steel reactor vessels and fabricated assemblies according to customer requirements.

FILTER HOUSINGS

Pressure-rated filter housings and specialized filtration equipment.

PRESSURE TANKS

Custom pressure-containing tanks and vessels.

SPECIAL PRESSURE EQUIPMENT

Customer-specific pressure equipment manufactured according to project requirements.

1} FROM MATERIAL TO FINISHED PRESSURE EQUIPMENT

We begin with the customer's:

  • Equipment drawing
  • Design specification
  • Operating requirements
  • Material specification
  • Inspection requirements
  • Documentation requirements

TECHNICAL REVIEW

The manufacturing requirements are reviewed to establish the applicable fabrication, welding, inspection and testing activities.

03 — MATERIAL CONTROL

Use this line to say something about what you do. Add information that visitors may find interesting.

04 — FABRICATION

Shells, dished ends, nozzles, manways, supports and other components are fabricated according to the approved design.

05 — CONTROLLED WELDING

Welding is performed using applicable qualified procedures and qualified personnel according to project requirements.

06 — MACHINING & ASSEMBLY

Final inspection, documentation review and preparation for delivery.

08 — PRESSURE TESTING

The manufacturing requirements are reviewed to establish the applicable fabrication, welding, inspection and testing activities.

08 — PRESSURE TESTING

The manufacturing requirements are reviewed to establish the applicable fabrication, welding, inspection and testing activities.

09 — DOCUMENTATION 

Use this line to say something about what you do. Add information that visitors may find interesting.

MATERIAL TRACEABILITY

CONTROLLED MATERIALS FOR PRESSURE EQUIPMENT

Material selection and traceability are important elements of pressure-equipment manufacturing.

Depending on the project requirements, material control can include:

  • Material grade verification
  • Heat / batch identification
  • Material Test Certificates
  • EN 10204 documentation
  • PMI verification where required
  • Material traceability throughout manufacturing

Common stainless-steel materials may include:

SS 304 / 304L
SS 316 / 316L

Other materials can be considered according to the approved equipment design and project specification.

PED WELDING

CONTROLLED WELDING FOR PRESSURE EQUIPMENT


Welding is  critical manufacturing activity for pressure equipment.

Our fabrication scope can include:

  • Shell welding
  • Circumferential welding
  • Longitudinal welding
  • Dished-end welding
  • Nozzle welding
  • Manway welding
  • Support welding
  • Internal component welding
  • Pipe connection welding

Depending on the project, welding documentation can include:

  • WPS
  • PQR / WPQR
  • Welder qualification records
  • Welding consumable documentation
  • Weld maps
  • Weld inspection records

All applicable welding requirements are established according to the specific project and conformity requirements.

INSPECTION & TESTING

VERIFYING PRESSURE EQUIPMENT BEFORE RELEASE

Pressure equipment requires controlled inspection throughout manufacturing.

Depending on the approved inspection plan, activities may include:

DIMENSIONAL INSPECTION

Verification of vessel dimensions, nozzle locations, connections and critical tolerances.

VISUAL INSPECTION

Inspection of fabrication, welds, surfaces and components.

PMI

Positive Material Identification where required.

NDT

Applicable non-destructive examination such as UT, RT or other specified methods.

PRESSURE TESTING

Applicable hydrostatic or other approved pressure-testing procedures.

FINAL INSPECTION

Final verification before equipment release.

PED CONFORMITY ASSESSMENT


PED conformity assessment is dependent on the equipment's classification and applicable requirements.

Factors that may influence the conformity-assessment route include:

  • Equipment type
  • Maximum allowable pressure
  • Volume
  • Nominal size
  • Fluid group
  • Equipment category
  • Applicable conformity-assessment module

For each project, the applicable requirements should be established before manufacturing and incorporated into the project quality and technical documentation.

CE marking and PED conformity are applied according to the applicable regulatory and conformity-assessment requirements for the specific equipment

A COMPLETE QUALITY & MANUFACTURING RECORD


For applicable PED projects, documentation can be structured according to the agreed project requirements.

The documentation package may include:

  • Material certificates
  • EN 10204 3.1 certificates
  • Material traceability records
  • WPS / WPQR
  • Welder qualification records
  • Weld maps
  • Dimensional inspection reports
  • PMI reports
  • NDT reports
  • Pressure-test reports
  • Surface inspection records
  • Final inspection reports
  • Certificate of Conformity, where applicable
  • Technical documentation as required

Documentation is project-specific and is prepared according to the applicable requirements.

DESIGN & MANUFACTURING DOCUMENTATION

WORKING FROM APPROVED ENGINEERING INFORMATION

    Mapsons supports PED-related manufacturing using customer-provided engineering documentation such as:

    2D DRAWINGS
    PDF • DWG • DXF

    3D MODELS
    STEP • STP • IGES • SLDPRT

    TECHNICAL SPECIFICATIONS

    GENERAL ARRANGEMENT DRAWINGS

    MATERIAL SPECIFICATIONS

    INSPECTION & TEST PLANS

    Where design responsibility remains with the customer or appointed engineering organization, manufacturing is carried out against the approved design documentation.CE marking and PED conformity are applied according to the applicable regulatory and conformity-assessment requirements for the specific equipment.

    Items have been added to cart.
    One or more items could not be added to cart due to certain restrictions.
    Added to cart
    Quantity updated
    - An error occurred. Please try again later.
    Deleted from cart
    - Can't delete this product from the cart at the moment. Please try again later.